Desk 02 · Robot cells and fixtures

Robot cells and welding fixtures, designed around your process.

aksutec designs and builds robotic cells, welding fixtures and automation systems for factories in the UK and Europe, working from Enfield, North London. Send the part, the cycle time and the floor space you have.

Line stopped? Call +44 7534 068005. Drawings and longer questions: info@aksutec.com.

Drawing
AKS-RC
Sheet
04 / 17
Rev
2026-11-16
What do you need?

Send a part number or a photo of the rating plate. A person checks every request; this is not an automatic stock search.

Line stopped? Call first. We will pick up the request below too.

Robot part details
Rating plateoptional
Add a photo of the rating plateJPEG, PNG, WebP or HEIC, up to 8 MB.
More detail (optional)
Machining, cell or fixture details
Drawingoptional
Attach a drawingPDF, STEP, STP, DXF, DWG, PNG or JPG, up to 8 MB.
More detail (optional)
Air filter details
More detail (optional)

For example G4, F7 or H13.

Your details
Add a message

Files up to 8 MB. We use your details only to answer this request.

Robotic cells, laid out on one sheet.

A robotic cell is a robot plus everything that makes it safe and useful: the guarding, the operator station, the tooling, the way parts come in and go out. The plan view shows a typical arrangement, a robot inside a fence with a two-station turntable, so the operator loads one side while the robot works on the other, and a light curtain at the operator station. Your cell will differ. The drawing shows how we think about it.

We start with the part and the cycle time, then choose the layout, then the robot. If you already own a robot, we check whether its reach, payload and controller suit the job before we propose anything new. If you need one, new and used KUKA robots are on the robots desk, with ABB, FANUC and other brands on request.

Plan view of a robot cell with fence, robot, two-station turntable, operator station and light curtainST1ST2CTRLROBOTGUARD FENCELIGHT CURTAINOPERATOR2-STATION TURNTABLECELL · PLAN
Welding fixture schematic: base plate, locating pins, toggle clamps and part outlineLOCATING PINTOGGLE CLAMPPART OUTLINEBASE PLATEFIXTURE · ISOMETRIC

Welding fixtures, that hold the part where it should be.

A fixture decides whether the tenth part matches the first. It is a base plate, locating pins that fix the part in space, and clamps that hold it without distorting it, with room for the torch or the robot to reach every weld. The schematic shows the parts of a simple fixture and the dashed outline of the workpiece.

A fixture can be a job in its own right, for manual welding, or part of a robotic cell. Send the part drawing, mark the weld locations, and tell us how many parts you expect to make. That tells us how much to invest in locating and clamping, and whether the fixture should be quick to load by hand or built for a robot to load.

How a cell or fixture job runs, in five steps.

Cells and fixtures follow one order, so you know what comes next and what we need from you at each point. Nothing is made until you have approved the concept and accepted the quotation.

  1. 01

    Part and process

    You send the part, the process, the cycle time and the floor space. A person reads it.

  2. 02

    Layout and concept

    We show a layout and a concept. You approve it before anything is built.

  3. 03

    Quotation

    A written quotation with scope, lead time and what we have assumed. Nothing is made until you accept it.

  4. 04

    Build

    The cell or fixture is built to the approved layout. Machined components come through our Eskişehir route.

  5. 05

    Inspection and delivery

    Inspected to the requirements we agreed, packed and delivered in the UK or Europe.

What we need from you.

A photo of the area with rough dimensions is enough to begin. We come back with questions before we quote.

What to send for a robot cell or welding fixture, and why we ask
ItemWhat to sendWhy we ask
The partDrawings, a sample or a photo, with the material and weight.Sets how the part is located, held and handled.
The processWelding, handling, assembly, machine tending or something else, and the cycle time you need.Decides the layout and whether a robot is needed.
The floor spaceA plan or a photo with rough dimensions, and where power and air come from.Fixes the size of the cell and its guarding.
Safety and sign-offThe standards your site requires, and who signs off the finished cell.Guarding and controls follow what your site requires.
Existing robotIts model and controller if one is on site, or say that one is part of the job.Reach, payload and controller must suit the job.
Plan view of a robot cell with fence, robot, two-station turntable, operator station and light curtainST1ST2CTRLROBOTGUARD FENCELIGHT CURTAINOPERATOR2-STATION TURNTABLECELL · PLAN

Where a job needs machined components, plates, pins, brackets or housings, we arrange them through our build-to-print machining route in Eskişehir, Türkiye. We design and build robotic cells, welding fixtures and automation systems: special-purpose machinery that handles, positions or assembles a specific part.

Cells and fixtures: common questions.

What do you design and build?

Robotic cells, welding fixtures and automation systems around a specific part and process. That covers the layout, the fixture or tooling, the robot selection and the integration of guarding and operator stations.

Can you use a robot I already have?

Often, yes. Tell us the model and controller. Part of the first review is checking whether the reach, payload and controller suit the job. We also supply new and used KUKA robots, with ABB, FANUC and other brands on request.

What do you need from me to start?

The part or drawings, the process and cycle time, the floor space, and the site requirements for safety. A photo of the area with rough dimensions is enough to begin with. We come back with questions before we quote.

Do you make just the welding fixture, without a cell?

Yes. A fixture can be a job on its own: base plate, locating pins and clamps built to hold your part for manual or robotic welding. Send the part drawing and the weld locations, and say how many parts you expect to make.

Who approves the design?

You do. We give you the concept and the layout drawing first. Manufacture starts after you have approved them, and any change after that is agreed in writing with its effect on cost and lead time.